WirewalkAI Commission an engagement

The Operating Review › Industries › Manufacturing › Proposal

Proposal — Manufacturing

Standard cost said one thing. The line said another.

This is what we would actually do, in what order, and what it costs. No discovery call is required to see the number.

What we would go looking for

These are patterns that recur in manufacturing, written as things to look for. They are not findings from a named engagement.

  1. Standard costs last genuinely rebuilt several years ago, so reported margin by product is a well-formatted guess.
  2. Scrap and rework booked to a variance account that is reviewed in total and never by line, so a single bad process hides inside an acceptable aggregate.
  3. Freight accessorials — detention, demurrage, fuel, redelivery — turning a negotiated rate into a materially different paid rate.
  4. Obsolete stock carried at cost because writing it down needs an authorization nobody wants to sign.
  5. A single-source component with no alternate qualified, priced accordingly and reviewed never.

The sequence

Five weeks for one operating unit. More units run in parallel rather than in series, so a group does not take five times as long.

What each week actually involves, what arrives at the end of it, and how we behave while we are in there — written down once rather than repeated on every sector's proposal.

What we need from you

3 core requests written for manufacturing, inside the full intake. Anything you do not have can be skipped with a reason — skipping narrows what the review can conclude, and we tell you where before the work starts rather than after.

If any of this is already happening

The review is always worth doing and rarely urgent. It becomes urgent when something else is happening — and if one of these is, the sequence above compresses to fit it.

Who needs to be in the room

What it costs

Priced by operating unit — an entity, a location, or a business the accounts are kept separately for. The second unit costs less than the first because by then the intake is built, the chart of accounts is understood and the patterns are known.

—
Choose a scope to see the price.

    Purchase order is the primary route — most buyers this size raise a PO and pay against an invoice on terms. Card and bank transfer exist for those who prefer them.

    Read first, if you would rather