WirewalkAI Commission an engagement

The Operating Review › Industries › Aerospace and defense › Proposal

Proposal — Aerospace and defense

Here, a compliance lapse is not a fine. It is a contract you may no longer bid.

This is what we would actually do, in what order, and what it costs. No discovery call is required to see the number.

What we would go looking for

These are patterns that recur in an aerospace and defense manufacturer, written as things to look for. They are not findings from a named engagement.

  1. A NIST SP 800-171 self-assessment score submitted to SPRS with a plan of action behind it that was written to close the gap on paper rather than in the network.
  2. ITAR-controlled technical data on a shared drive that is segregated in the policy and reachable in practice.
  3. Indirect rate structure built around a program that ended, with the overhead still allocated across work that cannot carry it.
  4. Build-to-print parts quoted from standards set several revisions ago, so reported margin by part number is a well-formatted guess.
  5. Long-lead material bought against a forecast that moved, sitting as inventory no program will absorb.

The sequence

Five weeks for one operating unit. More units run in parallel rather than in series, so a group does not take five times as long.

What each week actually involves, what arrives at the end of it, and how we behave while we are in there — written down once rather than repeated on every sector's proposal.

What we need from you

5 core requests written for an aerospace and defense manufacturer, inside the full intake. Anything you do not have can be skipped with a reason — skipping narrows what the review can conclude, and we tell you where before the work starts rather than after.

If any of this is already happening

The review is always worth doing and rarely urgent. It becomes urgent when something else is happening — and if one of these is, the sequence above compresses to fit it.

Who needs to be in the room

What it costs

Priced by operating unit — an entity, a location, or a business the accounts are kept separately for. The second unit costs less than the first because by then the intake is built, the chart of accounts is understood and the patterns are known.

—
Choose a scope to see the price.

    Purchase order is the primary route — most buyers this size raise a PO and pay against an invoice on terms. Card and bank transfer exist for those who prefer them.

    Read first, if you would rather